Shandong Hengyang New Materials | Geosynthetics plant, Dezhou Geomembrane · Geotextile · Composite liner · GCL 400 Hotline 400-1588-538+86 156 8951 2579 中文EN
INSIGHTS · industry

Geomembrane price per square metre: six thickness grades and what moves the quote

2026-11-27 · Written by Hengyang Technical Department · Reviewed by Zhang (engineering procurement) · Sources: current standards and batch test reports

Standard answer summary

The 0.3, 0.5, 0.75, 1.0, 1.5 and 2.0 mm grades set performance position, typical duty and relative price lev. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).

Source: Hengyang technical department | Updated: 2026-11-20

Asking “how much per square metre” often produces a set of quotes on different bases. A fixed unit price is not posted publicly because resin grade, thickness grade, standard level, quantity, lead time and distance each move the unit price noticeably; a dead price on the page would mislead. This note works through six common thickness grades — 0.3, 0.5, 0.75, 1.0, 1.5 and 2.0 mm — to set out performance, typical duty and relative price, so you can compare quotes on one basis.

Six thickness grades: match duty first, then price

Thickness is the most obvious split in a quote: the thicker the sheet, the more material per square metre and the higher the price. But one grade up is not automatically good value; thickness must match head, base and specification. The table below lists the six common grades with performance position and typical duty, so you can place the duty first and go back to resin and standard when discussing price.

Thickness gradePerformance positionTypical dutyRelative price level
0.3 mmThin and light, flexible; limited puncture and weathering marginLow-head temporary cover, shallow landscape temporary lining, rain cover, short-term pond temporary linerLow
0.5 mmConventional shallow-water grade, light to lay, suits a prepared soil baseFish ponds, small reservoirs, irrigation canals, shallow lake areas, canal liningLow-mid
0.75 mmMedium thickness, balance of cost and puncture resistanceMedium reservoirs, wastewater primary liner, landfill cover, temporary slope liningMid
1.0 mmCommon main grade, balanced indices and installation maturityReservoirs, wastewater ponds, medium landfills, general tailings and chemical pools, regular soil baseMid-high
1.5 mmHigh-risk primary liner, ample puncture and safety marginMunicipal landfill base, hazardous storage, exposed liner, gravel base and machine working areasHigh
2.0 mmHeavy grade, for high head and harsh base conditionsHigh-head tailings, heavy-metal seepage control, heavy-load and steep-slope duty, design-specified thickened partsHigh (top)

The “relative price level” above is a material and cost relationship on one comparable basis, not a fixed unit price per square metre. The actual quote moves with resin grade, standard, surface, quantity, lead time and distance.

Why two quotes on the same thickness still differ

Two quotes both written “1.0 mm geomembrane” can still differ by a margin, usually not because of the thickness itself but because of conditions that are easy to leave out.

Resin grade. Virgin resin and regrind differ clearly: virgin resin has better oxidation induction time (OIT), weathering and performance stability; a regrind quote is lower but the ageing margin and batch consistency are reduced. Judge from the batch report — OIT, carbon black content and tensile indicators — rather than the unit price alone.

Standard grade. The general seepage-control grade GH-1 and environmental grades GH-2S, GH-2T1 and GH-2T2 differ in indices and formulation; environmental and tender projects normally respond to an environmental grade, priced above the general grade. Put the executed standard and code in the enquiry.

Surface type. Smooth, single-textured and double-textured sheets differ in price; textured membrane resists slip on slopes and costs more to produce than smooth. The base often uses smooth; slopes choose texture to meet the friction requirement.

Composite structure. A single membrane and one-cloth-one-membrane or two-cloth-one-membrane composites differ; the added geotextile mass per area adds material and price together. Do not compare composite and single membrane on one unit price.

Width and customisation. Wider rolls cut seams but are limited by transport width and site lifting; custom width, roll length or cut-to-size add production yield loss and raise the quote.

Quantity and lead time. Full-truck direct dispatch, regular specs and normal scheduling are cheapest; small batches, short lead times, urgent orders and custom packing all add cost.

Distance and delivery. Full-truck and LTL differ; delivery address, crane or forklift on site, and waiting on site all change the landed cost.

Testing and documentation. Batch reports, third-party testing, certificates and invoice requirements differ, and the documentation basis shows in the price; state the document list early for high-risk projects.

How to compare quotes on one basis

Comparing price is not about finding the lowest unit price. Put the conditions on one enquiry sheet: product and structure, thickness and width, executed standard and index grade, quantity and packing, delivery address and lead time, documentation and invoice requirements. When every supplier quotes on the same basis the prices are comparable; where the basis differs, a low price usually means a concession on thickness, formulation or standard grade.

Production line and supply capacity

The photos show the geomembrane production line at the Hengyang plant in Lingcheng, Dezhou, Shandong: wide blown film and winding, multi-roller draw and setting, finished rolls racked, covering regular to heavy-duty grades. Batch test reports and certificates travel with the goods; samples can be sent for regular specs.

For a landed price per square metre, send the duty and the six inputs above; the technical team gives a comparable quote by specification, quantity and delivery address. A plant visit can also be arranged to check rolls, batch reports and retained samples on site.

Related materials and scenarios

How pricing worksHDPE geomembraneComposite geomembrane

How much does a geomembrane cost per square metre?

The unit price moves with resin grade, thickness grade, standard level, surface and composite structure, quantity, lead time and distance; no fixed dead price is posted publicly. Quote on duty and specification, one comparable basis, to get a comparable number.

What duty can 0.3 mm geomembrane serve?

Mostly low-head temporary cover, shallow landscape temporary lining and rain cover. Long-term exposure, deep water or a sharp base should move up to 0.5 mm or above.

Is thicker always more expensive and better?

Thicker uses more material and costs more, but it is not automatically the right fit. Excess thickness adds welding, anchoring and transport cost; seepage-control failures often start at sharp base stones, seams and anchors. Thickness must match the duty.

How do I get an accurate quote?

Provide six inputs: product and structure, thickness and width, standard and index grade, quantity and packing, delivery address and lead time, documentation and invoice requirements, and the quote lines up in one pass.

Send us your project conditions

We reply with datasheets, test reports and a quotation within one business day.

Request a quotationEmail us
Call Top