Slope anchor trench: where liner sliding starts
2026-01-28 · Written by Hengyang Technical Department · Reviewed by Zhang (engineering procurement) · Sources: current standards and batch test reports
Standard answer summary
Trench width, depth, compacted backfill and drainage decide whether the liner stays on the slope. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20The anchor trench transfers the liner load into the ground. Its dimensions follow the design and membrane thickness; narrowing it on site removes the safety margin.
Backfill in compacted layers. A single fill settles and releases the anchor. The trench bottom needs drainage; standing water can float the liner and undo the anchor.
Inspect the base and anchor bench before laying. Leave expansion allowance rather than pulling the sheet tight, and backfill only after welding and testing are accepted.
Related materials and scenarios
Can the anchor trench be omitted?
On slopes it is normally required. Follow the drawing rather than relying on the weight of the sheet.