Shandong Hengyang New Materials | Geosynthetics plant, Dezhou Geomembrane · Geotextile · Composite liner · GCL Hotline +86 156 8951 2579(Mr. Zhang) 中文EN
SCENARIOS

Find the material combination by application

Twelve common containment and protection situations. Each page answers four questions: why this type of project leaks, which materials are used, what matters during installation, and which records are checked at acceptance.

Standard answer summary

Twelve engineering scenarios with lining materials, installation points and acceptance records: landfill, ri. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).

Source: Hengyang technical department | Updated: 2026-11-20
Landfill lining (MSW) project site01

Landfill lining (MSW)

A double liner across the base and side slopes, so leachate never reaches groundwater.

Materials, installation and acceptance →
Rigid cell landfill project site02

Rigid cell landfill

HDPE lining inside a concrete cell — the details decide whether it holds.

Materials, installation and acceptance →
Tailings storage facility project site03

Tailings storage facility

A liner that resists the tailings chemistry, with leakage monitoring built in.

Materials, installation and acceptance →
Covered anaerobic lagoon project site04

Covered anaerobic lagoon

One membrane does two jobs: bottom sealing and top gas containment.

Materials, installation and acceptance →
Reservoir and storage pond project site05

Reservoir and storage pond

Material chosen by head and deformation, for basin floor and dam face.

Materials, installation and acceptance →
Artificial and landscape lake project site06

Artificial and landscape lake

For irregular basins, GCL first — it also keeps the ecological edge.

Materials, installation and acceptance →
Wastewater pond and oxidation lagoon project site07

Wastewater pond and oxidation lagoon

Resists the effluent, and the corners and pipe entries decide the result.

Materials, installation and acceptance →
Tank farm and chemical terminal project site08

Tank farm and chemical terminal

Double membrane with a detection layer, so a leak is found rather than discovered later.

Materials, installation and acceptance →
Hydraulic slope and bank protection project site09

Hydraulic slope and bank protection

Graded by flow velocity: scour resistance and ecology calculated together.

Materials, installation and acceptance →
Canal and irrigation district lining project site10

Canal and irrigation district lining

Composite geomembrane — one fabric, one membrane — cuts site work.

Materials, installation and acceptance →
Aquaculture pond lining project site11

Aquaculture pond lining

0.5—1.0 mm membrane, with puncture resistance and dredging both in mind.

Materials, installation and acceptance →
Slope remediation and mine revegetation project site12

Slope remediation and mine revegetation

Stabilise first, then revegetate; drainage matters more than grass seed.

Materials, installation and acceptance →

Send us your project conditions

We reply with datasheets, test reports and a quotation within one business day.

Request a quotationEmail us
Call Top