Why this type of project leaks

Wave action and high flow scour remove the cover and expose the membrane, while slope instability takes the whole system with it. Revegetation without drainage fails in the first wet season.

Recommended material combination

  • Liner: composite geomembrane or HDPE on the slope, anchored at crest and toe
  • Protection: geotextile plus riprap, gabion or concrete facing, selected by velocity
  • Drainage: drainage net or gravel blanket behind the facing
  • Ecology: erosion control mat or three-dimensional geomat where planting is required

Installation points

  • Anchor the crest and toe trenches before placing any protection
  • Velocity: select protection from the design flow, not from experience alone
  • Drainage: relieve uplift pressure behind the lining

What acceptance checks

  • Anchor trench inspection records
  • Protection layer thickness and placement records
  • As-built slope profile against the design section

Related standards

GB/T 17638-2017GB/T 17639-2023GB 50286-2013

Products used

GeotextileEcological BagCement Blanket

Related scenarios

Canal and irrigation district liningReservoir and storage pondSlope remediation and mine revegetation

All scenarios →

Send us your project conditions

We reply with datasheets, test reports and a quotation within one business day.

Request a quotationEmail us
Call Top