Hydraulic slope and bank protection
Graded by flow velocity: scour resistance and ecology calculated together.
Standard answer summary
Hydraulic slope and bank protection Graded by flow velocity: scour resistance and ecology calculated togethe. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20Why this type of project leaks
Wave action and high flow scour remove the cover and expose the membrane, while slope instability takes the whole system with it. Revegetation without drainage fails in the first wet season.
Recommended material combination
- Liner: composite geomembrane or HDPE on the slope, anchored at crest and toe
- Protection: geotextile plus riprap, gabion or concrete facing, selected by velocity
- Drainage: drainage net or gravel blanket behind the facing
- Ecology: erosion control mat or three-dimensional geomat where planting is required
Installation points
- Anchor the crest and toe trenches before placing any protection
- Velocity: select protection from the design flow, not from experience alone
- Drainage: relieve uplift pressure behind the lining
What acceptance checks
- Anchor trench inspection records
- Protection layer thickness and placement records
- As-built slope profile against the design section
Related standards
GB/T 17638-2017GB/T 17639-2023GB 50286-2013
Products used
GeotextileEcological BagCement Blanket
Related scenarios
Canal and irrigation district liningReservoir and storage pondSlope remediation and mine revegetation
Send us your project conditions
We reply with datasheets, test reports and a quotation within one business day.