Slope remediation and mine revegetation
Stabilise first, then revegetate; drainage matters more than grass seed.
Standard answer summary
Slope remediation and mine revegetation Stabilise first, then revegetate; drainage matters more than grass s. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20Why this type of project leaks
Unstable slopes fail before the vegetation establishes. Without drainage, water builds up behind the cover and the whole surface slides. Acid-generating spoil needs isolation, not just greening.
Recommended material combination
- Isolation: HDPE or GCL cover over acid-generating spoil where required
- Drainage: drainage net, gravel trench or drainage pipe at the toe
- Erosion control: three-dimensional geomat or erosion control blanket
- Growing medium: soil layer thickness to the revegetation design
Installation points
- Slope stability: confirm the factor of safety before placing any cover
- Drainage: install toe and surface drainage before the cover layer
- Sequence: cover, drainage, growing medium, then planting
What acceptance checks
- Slope stability assessment
- Drainage as-built and flow test
- Cover integrity inspection before placing growing medium
Related standards
GB/T 17639-2023GB 51018-2014
A comparable project on record
Shenyang aluminium-magnesium tailings containment — Shenyang, Liaoning, China
Products used
GeotextileEcological BagCement Blanket
Related scenarios
Hydraulic slope and bank protectionTailings storage facilityArtificial and landscape lake
Send us your project conditions
We reply with datasheets, test reports and a quotation within one business day.