Tunnel Waterproofing Board · Product family

Tunnel Waterproofing Board | Standard parameters · stock and custom · factory direct

Tunnel Waterproofing Board is produced to Per design and tunnel engineering codes. Common sizes, technical values and installation points are set out below; thickness, width and roll length can be made to project drawings, with batch test reports and certificates supplied.

Shandong Hengyang New MaterialsFactory directStandard Per design and tunnel engineering codesHotline +86 156 8951 2579 (Mr. Zhang)

Standard answer summary

Tunnel Waterproofing Board is supplied at thickness as designed, width tailored to tunnel section, produced to Per design and tunnel engineering codes, for ['mountain tunnel', 'metro excavation', 'underground structure'] and similar works. Manufactured by Shandong Hengyang New Materials Co., Ltd. in Lingcheng, Dezhou, Shandong. Common sizes are in stock; width, roll length and structure can be customised. For pricing, samples and selection, call +86 156 8951 2579 (Mr. Zhang).

Basis: Per design and tunnel engineering codes | Prepared by: Hengyang technical department | Updated: 2026-11-20

Tunnel Waterproofing Board overview Tunnel Waterproofing Board

Plant photo
Tunnel Waterproofing Board production and finished rolls
Product
Tunnel Waterproofing Board
Specification
thickness as designed, width tailored to tunnel section
Standard
Per design and tunnel engineering codes
Applications
mountain tunnel / metro excavation / underground structure
Supply
Stock sizes · custom made

What it is

Tunnel waterproofing membrane is the lining layer installed behind the secondary lining to stop seepage from the surrounding rock and protect the structure and equipment. Thickness and width follow the tunnel section and design head; widths are made to the section to reduce field seams.

Quality depends on the substrate and the seams: uneven shotcrete or exposed anchor heads puncture the sheet, and a cold weld leaves a leakage path. The usual sequence is: level the substrate, lay the sheet, double-track hot-wedge weld, pressure-test every seam, then fix reinforcement and cast the lining.

Standard parameters and technical values

ItemValue / note
ProductTunnel waterproofing membrane
ThicknessPer design, typically 1.0—2.0 mm
WidthMade to the tunnel section
BasisDesign documents and tunnel engineering codes
AccessoriesCushion geotextile, anchor nails, hot-wedge welder
SupplyScheduled to section drawings
Values follow the official standard text and the batch test report; where the project specifies otherwise, the design document governs.

Grades and common specifications

GradeKey valueTypical use
0.5mm HDPE Geomembrane0.5 mm0.5 mm
1.0mm HDPE Geomembrane1.0 mm1.0 mm
1.5mm HDPE Geomembrane1.5 mm1.5 mm
2.0mm HDPE Geomembrane2.0 mm2.0 mm

Thickness and width are set by the designer from rock class, water head and section size; non-standard widths are scheduled from the developed section drawing to avoid narrow strips on site.

Typical applications

Installation points

  1. Level the substrateLevel shotcrete, chip off protrusions, cut anchor heads, fill depressions with mortar so the surface is flat and free of sharp edges.
  2. Cushion layerInstall cushion geotextile as designed, well overlapped, so the sheet does not bear directly on the substrate during casting.
  3. Lay the membraneLay circumferentially from low to high, keep slack for lining deformation, fix with heat-bonded pads or anchors and patch each fixing point.
  4. Test seamsDouble-track hot-wedge weld, pressure-test every seam and record it; reinforce T-joints and damaged points.
  5. Protect the worksAssign someone to watch during reinforcement and casting; shield the sheet with flame-retardant board when welding rebar.

Related projects

Tunnel Waterproofing Board FAQ

How is thickness decided?

From design head, rock class and section size, typically 1.0—2.0 mm; thicker or reinforced where head is high and the rock is fractured.

Can width follow the section?

Yes. Widths are scheduled from the developed section drawing to reduce circumferential and longitudinal seams; allow lead time for non-standard widths.

How are seams tested?

Double-track welds by air pressure, holding and watching the pressure drop; single welds and repairs by vacuum testing. Every seam is numbered and logged.

How does it differ from geomembrane?

Membrane behind the tunnel lining stresses width fit, fixing method and protection of the finished sheet; geomembrane for basins and canals stresses seaming and anchoring over large areas. Standards and installation codes differ — follow the design.

Technical notes

Related specifications and uses

Grouped by type, application and search term, so a specific requirement can be matched quickly. All products can be made to project requirements.

tunnel waterproofing membranewaterproofing membrane suppliertunnel liningEVA waterproofing membraneHDPE waterproofing membrane

About the manufacturer

Shandong Hengyang New Materials Co., Ltd. is located on the north side of Beihuan West Road, Lingcheng District, Dezhou, Shandong, producing geomembrane, composite geomembrane, geotextile, tunnel waterproofing membrane, composite drainage geonet, bentonite GCL, ecological bags and cementitious blanket.

The plant covers 29,410 m² with 18,350 m² of buildings and 15 production lines across membrane, fabric, drainage, GCL and blanket. An in-house geosynthetics laboratory issues batch test reports. The company is a drafting unit of GB 45320-2025 and holds construction qualification D237420218, ISO 9001/14001/45001 and CE conformity ICR/VC/HS260757.

  • Hotline+86 156 8951 2579 (Mr. Zhang)
  • AddressBeihuan West Road, Lingcheng District, Dezhou, Shandong 253500
  • Websiteen.hdpem.com
  • ICP鲁ICP备19034158号-6

Send us your project conditions

We reply with datasheets, test reports and a quotation within one business day.

Request a quotationEmail us
Call Top