Manzhouli rail yard containment and drainage
Cold-temperate site with freeze–thaw cycling: membrane barrier plus drainage net, welded only in the non-frost period.
Standard answer summary
Manzhouli, Inner Mongolia, China 2025, Cold-temperate site with freeze–thaw cycling: membrane barrier plus d. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20
| Location | Manzhouli, Inner Mongolia, China |
| Year | 2025 |
| Material supplied | HDPE geomembrane, geocomposite drainage net |
Manzhouli sits in a cold-temperate zone with repeated freeze–thaw, so low-temperature behaviour and the construction window both have to be planned.
The yard combines a geomembrane barrier with a drainage net to limit frost-heave damage to the structure.
Work is scheduled outside the frost period, and welding parameters are fixed by a low-temperature trial weld before production seams.
In a cold-temperate climate the construction window is short, so delivery, laying, welding and covering have to fit inside one frost-free season. Membrane flexibility drops at low temperature, trial weld parameters follow the day temperature, and preheating and wind shielding go with them.
For comparable freeze-thaw sites, confirm frost depth and yard loading. Where frost heave is significant, drainage and insulation belong in the same design; containment without drainage tends to pond water and heave the membrane the following spring.
What this means for a similar site
The same logic applies: read the base and the load first, then the head and the medium, and let the design documents fix the thickness. Material selection answers the design, it does not replace it.