Why there is no fixed price list
Resin and fibre prices move, so a fixed list goes stale. We explain what drives the price, and you send six inputs to get a quotation that can be compared.
Standard answer summary
Geomembrane and geotextile prices follow resin grade, standard, thickness, composite structure, quantity, cu. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20Eight factors behind the price
- Resin and fibre grade — Virgin resin and regrind differ clearly in mechanical and ageing performance. This is the first source of price difference.
- Standard to be met — A general national standard and a project-specific specification set different thresholds and test items, so cost differs.
- Thickness and weight — Every step up in thickness adds material per square metre; the same logic applies to geotextile mass per area.
- Composite structure — One fabric plus one membrane, two fabrics plus one membrane — each added layer adds material and process steps.
- Order quantity — Full-truck volumes and small mixed orders carry different unit costs for scheduling, packing and freight.
- Customisation — Non-standard width, special thickness, textured surface and slitting occupy dedicated lines and are quoted separately.
- Distance and delivery — Shipping distance, direct-to-site delivery and unloading conditions all change the landed cost.
- Testing and documentation — Third-party testing, arrival re-testing, sample retention and acceptance support are part of the service cost.
Six inputs for a comparable quotation
- Product and structure, e.g. two fabric + one membrane, 0.5 mm membrane with 200 g/m² fabric
- Specification: thickness and roll width, or mass per area and width
- Standard and year, or the index values in the design file
- Quantity and packing: full rolls, cut lengths or pallets
- Delivery address, date and unloading conditions — crane or forklift available
- Documentation: third-party reports, CE declaration and invoice type required
With these inputs the first quotation matches the requirement. Without them we can give a range, but the landed price waits for the specification.
Send us your project conditions
We reply with datasheets, test reports and a quotation within one business day.