Reservoir and storage pond
Material chosen by head and deformation, for basin floor and dam face.
Standard answer summary
Reservoir and storage pond Material chosen by head and deformation, for basin floor and dam face. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20Why this type of project leaks
Head pressure on the dam face and settlement in the basin work the membrane in different ways. Slope friction, wave action and outlet structures are where leaks start.
Recommended material combination
- Basin: 1.5—2.0 mm HDPE, or composite geomembrane, to the design
- Dam face: textured HDPE on slopes steeper than 1:2.5, or composite geomembrane with geotextile
- Drainage: drainage net or gravel layer beneath the protection layer
- Protection: geotextile plus riprap or concrete facing in the wave zone
Installation points
- Slope friction: check the interface friction angle for the actual soil and texture
- Outlets: prefabricated boots and concrete collars, not field patches
- Wave zone: protect the membrane above the design water line
What acceptance checks
- Interface friction test data supporting the slope design
- Weld records and leak survey results
- Detail drawings for outlet and intake structures
Related standards
GB/T 17643-2025GB/T 17642-2025GB 50290-2014
A comparable project on record
Hetao irrigation district canal lining — Inner Mongolia, China
Products used
HDPE GeomembraneComposite GeomembraneGeotextile
Related scenarios
Artificial and landscape lakeCanal and irrigation district liningHydraulic slope and bank protection
Send us your project conditions