Hetao irrigation district canal lining
Canal lining in a large irrigation district: composite geomembrane, width cut to the lining block to reduce field seams.
Standard answer summary
Inner Mongolia, China 2024, Canal lining in a large irrigation district: composite geomembrane, width cut to. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20
| Location | Inner Mongolia, China |
| Year | 2024 |
| Material supplied | Composite geomembrane (one-layer and two-layer fabric) |
The Hetao district is one of the largest irrigation schemes in China, and canal lining is where seepage loss is won or lost.
Composite geomembrane was used: the membrane carries the barrier duty, the fabric protects it and raises friction against the subgrade. Roll width was cut to the concrete lining block, which removed a large share of transverse seams.
Sequence is subgrade trimming, membrane placement, hot-wedge welding, fabric overlap, then concrete lining. Every weld was air-tested by batch and the records kept for the acceptance file.
Material arriving on site is checked batch by batch: membrane and fabric specification, roll length, batch number, with thickness and mass per area sampled and the reports travelling with the delivery. The earthworks contractor accepts base level and compaction before laying, and the supervisor inspects laps and weld numbering afterwards.
For a comparable irrigation upgrade, settle three things first: canal section and design depth, lining type (cast in situ or precast panel), and construction season. Once those are fixed, the membrane-to-fabric ratio and panel width can be set in one pass, which keeps joint count and programme predictable.
What this means for a similar site
The same logic applies: read the base and the load first, then the head and the medium, and let the design documents fix the thickness. Material selection answers the design, it does not replace it.
Topics
Canal liningIrrigation districtsComposite geomembrane
Scenario: Canal and irrigation district liningComposite Geomembrane
Send us your project conditions