Rigid cell landfill HDPE lining inside a concrete cell — the details decide whether it holds. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20Why this type of project leaks
In a rigid cell the membrane is fixed to concrete, so every corner, pipe penetration and construction joint becomes a potential leak path. Thermal movement and settlement concentrate stress exactly at those details.
Recommended material combination
- Primary membrane: 1.5—2.0 mm HDPE, pre-laid or post-laid against the concrete
- Cushion: 400 g/m² geotextile or a prepared screed to protect the membrane
- Details: prefabricated corner pieces and pipe boots instead of field-cut patches
- Monitoring: conductive or drainage layer under the membrane where leak detection is specified
Installation points
- Concrete surface: fill honeycomb and sharp edges, and keep moisture within the adhesive spec
- Penetrations: prefabricated boots only, no field-cut patches around pipes
- Joints: leave movement allowance at corners and avoid bridging the membrane across gaps
What acceptance checks
- Pull or peel tests on bonded seams and terminations
- Spark or vacuum test on every patched area
- As-built drawing locating each detail patch
Related standards
GB/T 17643-2025GB 50208-2011
Products used
Related scenarios
Landfill lining (MSW)Tank farm and chemical terminalWastewater pond and oxidation lagoon
Send us your project conditions
We reply with datasheets, test reports and a quotation within one business day.