Wastewater pond and oxidation lagoon
Resists the effluent, and the corners and pipe entries decide the result.
Standard answer summary
Wastewater pond and oxidation lagoon Resists the effluent, and the corners and pipe entries decide the resul. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20Why this type of project leaks
Effluent chemistry varies by industry and shifts with the season, while aeration and sludge cleaning add mechanical wear. Corners and pipe entries are the first places to leak.
Recommended material combination
- Liner: 1.0—1.5 mm HDPE, grade selected for the effluent chemistry
- Cushion: 300—400 g/m² geotextile on prepared subgrade
- Pipe entries: prefabricated boots or HDPE flange connections
- Odour control: HDPE cover with gas outlets where required
Installation points
- Check pH extremes and solvent content before selecting the grade
- Corners: prefabricated corner pieces rather than field pleats
- Cleaning: no sharp tools on the membrane, and keep a sand layer where dredging occurs
What acceptance checks
- Chemical compatibility statement for the effluent
- Weld tests and boot test records
- Subgrade acceptance before laying
Related standards
GB/T 17643-2025GB 50290-2014
A comparable project on record
Drilling site containment, Bohai oilfield area — Bohai oilfield area, North China
Products used
Related scenarios
Covered anaerobic lagoonTank farm and chemical terminalLandfill lining (MSW)
Send us your project conditions