Drilling site containment, Bohai oilfield area
Temporary, relocatable containment for oilfield drilling pads: oil-resistant HDPE membrane, custom roll lengths, recoverable after the pad moves.
Standard answer summary
Bohai oilfield area, North China 2023–2025, Temporary, relocatable containment for oilfield drilling pads: o. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20
| Location | Bohai oilfield area, North China |
| Year | 2023–2025 |
| Material supplied | HDPE geomembrane |
Containment on drilling pads is temporary and movable, so the material has to tolerate oil contamination, lay quickly and be recoverable.
HDPE geomembrane was supplied with roll lengths cut to the pad dimensions, which cut field trimming. Placement is overlap plus ballast, with hot-wedge welding at critical nodes.
Purchasing runs under a framework agreement covering several years and several operating areas.
Temporary containment asks something different from a permanent works: easy handling, reusability and controllable site cutting. Rolls are cut to the working area to reduce field joints, and recovered sheets are inspected for scoring and ageing before reuse.
For a similar oilfield site, confirm the medium (crude, drilling fluid or oily water), the campaign length and the base condition. The medium sets the grade, the campaign length decides whether a recoverable solution is worth it, and the base decides whether a cushion layer is needed.
What this means for a similar site
The same logic applies: read the base and the load first, then the head and the medium, and let the design documents fix the thickness. Material selection answers the design, it does not replace it.