Acceptance file: seam records, repairs and as-built drawings

2026-11-10 · Written by Hengyang Technical Department · Reviewed by Zhang (engineering procurement) · Sources: current standards and batch test reports

Standard answer summary

Acceptance depends on an evidence chain: material, seams, repairs, testing and as-built drawings must line u. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).

Source: Hengyang technical department | Updated: 2026-11-20

Material documents include batch reports, certificates, datasheets and site receiving records. Every roll and geotextile batch must trace to a batch number.

Seam records show welder, machine, temperature, speed, date, location and test result. Repair records show cause, location, patch size and retest.

As-built drawings mark laid area, overlap, anchor trenches, penetrations and repairs. Future excavation or maintenance depends on this drawing, not photos alone.

Related materials and scenarios

Who prepares the acceptance file?

The contractor prepares it; supervisor and owner review. The supplier provides batch reports and certificates.

Can photos replace records?

No. Photos support the record; seam location, parameters and test data belong in the forms.