Base preparation: stones, roots and moisture

2026-11-16 · Written by Hengyang Technical Department · Reviewed by Zhang (engineering procurement) · Sources: current standards and batch test reports

Standard answer summary

The base is the first structure under the liner. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).

Source: Hengyang technical department | Updated: 2026-11-20

Remove roots, stones and construction debris, then grade and compact. Do not bury sharp stones and assume they are invisible; inspect before backfill.

Wet soft ground needs drainage, drying or replacement. Welding on a rubbery mud surface sinks the sheet and leaves voids after backfill.

Trim slopes to a even profile without steps or sudden benches. Set out anchor trench position, width and depth, and compact the trench bottom before laying.

Related materials and scenarios

What compaction is required?

Follow the design, commonly not less than 90%; high-risk landfills require higher and in-situ testing.

Can it be laid on concrete?

Yes, if the surface is level and free of sharp ridges; a cushion geotextile may be needed.