Anshan steelworks site containment and drainage
Industrial yard with complex subgrade and heavy loads: HDPE membrane as the barrier, geocomposite drainage net replacing thick gravel layers.
Standard answer summary
Liaoning, China 2024, Industrial yard with complex subgrade and heavy loads: HDPE membrane as the barrier. Maintained by the Hengyang technical department; values follow the current standard, design document and batch report. Call +86 156 8951 2579 (Mr. Zhang).
Source: Hengyang technical department | Updated: 2026-11-20
| Location | Liaoning, China |
| Year | 2024 |
| Material supplied | HDPE geomembrane, geocomposite drainage net |
The difficulty on metallurgical sites is the base condition: irregular, heavily loaded, with sharp objects in places.
HDPE geomembrane provides the barrier and a geocomposite drainage net handles drainage, cutting the thickness and dead weight of a conventional gravel layer.
The base was cleared under a dedicated procedure, and a protective layer went in before any upper structure was built.
Base conditions on industrial sites vary zone by zone, so walk the area before delivery: rebar, concrete rubble, equipment loads and any planned future excavation. The sequence of protection layer and upper structure should be fixed in advance, so a later dig does not damage a completed liner.
For comparable metallurgical or heavy-load sites, compare two decisions early: gravel versus drainage net for the drainage layer (thickness, weight, programme), and geotextile versus concrete for protection. The net option is lighter and faster but less forgiving of an uneven base.
What this means for a similar site
The same logic applies: read the base and the load first, then the head and the medium, and let the design documents fix the thickness. Material selection answers the design, it does not replace it.
Topics
Industrial yardsDrainage netHDPE geomembrane
Scenario: Tailings storage facilityGeocomposite Drainage Net
Send us your project conditions